Vida Wolf Interior
Vida Wolf
Get A Quote →

Crafting Exceptional Environments

Office Fit-Out

Halian Dubai Office

The Galleries, Jebel Ali, Dubai

Project Overview

Full Category B office fit-out for Halian, a global recruitment agency, across a complete floor at The Galleries, Jebel Ali - delivering open-plan workstations, glass-partitioned meeting rooms, a boardroom, client lounge, and full MEP installation throughout.

The Brief

Halian needed a Category B fit-out that reflected a global recruitment brand - professional enough for client meetings, but open and collaborative enough for a busy consultant floor.

Inspiration

A bright, transparent workplace built around glass partitioning, so natural light reaches every workstation while still giving meeting rooms and the boardroom proper acoustic privacy.

At A Glance

Location
The Galleries, Jebel Ali, Dubai
Category
Office Fit-Out
Gallery
42 items

Scope of Works

  • Cat B office fit-out
  • Glass partitioning
  • Boardroom & meeting rooms
  • Client lounge
  • Open-plan workstations
  • Herringbone timber flooring
  • Ceiling systems & lighting
  • Full MEP installation
Start a Similar Project →
Materials & Finishes
Full-height glass partitioning with acoustic seals
Herringbone-laid timber-effect flooring
Suspended ceiling with integrated lighting grid
Branded joinery in the client lounge and reception
Acoustic ceiling and wall panelling in meeting rooms
How We Delivered It
01

Space planning

We worked from Halian's headcount and department structure to plan workstation density, meeting room count, and the boardroom layout before construction started.

02

Cat B base build

Partitioning, ceiling systems, and MEP first fix were installed across the full floor to Category B standard ahead of finishes.

03

Glass partitioning & joinery

Glass-framed meeting rooms and the boardroom were fitted out, alongside bespoke joinery in the client lounge and reception.

04

Flooring, lighting & handover

Herringbone flooring and the final lighting grid were completed last, with a full commissioning and snagging process before staff move-in.

Full Gallery
42 items
Follow Our Work

More on Instagram

Short cuts from this and other Vida Wolf projects.

11 reels
Next ProjectJVC Villa
Start Your Project

Ready to start your own project?

Tell us what you have in mind and we'll take it from there.